Hour ending — ET · GRIDFRONT compilation
U.S. load now
591 GW
GRIDFRONT modeled hour — not EIA
Net generation (modeled)
862 GW
GRIDFRONT modeled net gen — not online capability, not EIA
Gen − load
270 GW
31% unused generation this hour · not a reserve margin
Data-center draw
41.4 GW
7% of load · 2026 operating estimate, not metered
2025/26 summer peak
847 GW
FERC/ISO reported peaks · GRIDFRONT compilation — not EIA-930
30-day U.S. load
—
Daily average
GRIDFRONT series · updates once a day — not EIA
Fill is load ÷ this-hour net generation (steel → amber). Not a reserve margin. Toggle fuels — including storage — onto the map.
RTO · 13 states + D.C.
PJM Interconnection
Mid-Atlantic, Ohio, northern Virginia, ComEd (northern IL)
- Installed (GRIDFRONT)
- 192 GW
- Data-center load
- 13.6 GW
- DC share of load
- 13%
- Clusters on map
- 6
Installed mix · GRIDFRONT
- Nuclear31.6 GW
- Coal28.0 GW
- Gas80.0 GW
- Wind11.5 GW
- Solar15.2 GW
- Storage5.5 GW
- Hydro / other20.2 GW
Data-center clusters
- Northern Virginia5.6 GW · +11 GW
- New Albany / Columbus2.1 GW · +5.2 GW
- Chicago820 MW · +1.4 GW
- Lancaster / Carlisle680 MW · +1.5 GW
- North Jersey420 MW · +400 MW
- Pittsburgh240 MW · +600 MW
- Other / dispersed3.7 GW
Cluster sum 9.9 GW + other 3.7 GW = 13.6 GW zone total (GRIDFRONT 2026 estimate).
SMR / nuclear-for-compute
Meta × Oklo campus · Offtake / siting
Aurora power campus · early 2030s · Meta
Crane Clean Energy Center · Large-plant restart
1 × 835 MW · H2 2027 · Microsoft
Susquehanna AI campus · Offtake / siting
Behind-the-meter offtake · 2027–29 · Amazon
Virginia SMR exploration · LOI / exploration
Early site / JDA · 2030s · Amazon / NoVA data centers
Sites on the map
- Salem / Hope Creek · Nuclear3.6 GW
- Peach Bottom · Nuclear2.8 GW
- Susquehanna · Nuclear2.5 GW
- Braidwood · Nuclear2.5 GW
- Byron · Nuclear2.3 GW
- Limerick · Nuclear2.3 GW
| Region | Load | Net gen | Load / gen | DC load | Installed |
|---|---|---|---|---|---|
| SE | 118.2 GW | 168.0 GW | 70% | 5.2 GW | 230 GW |
| PJM | 108.4 GW | 148.2 GW | 73% | 13.6 GW | 192 GW |
| MISO | 88.1 GW | 132.4 GW | 67% | 2.6 GW | 191 GW |
| ERCOT | 66.2 GW | 92.8 GW | 71% | 6.6 GW | 205 GW |
| SPP | 40.4 GW | 61.5 GW | 66% | 1.6 GW | 100 GW |
| FLA | 40.1 GW | 54.6 GW | 73% | 0.6 GW | 70 GW |
| SW | 36.6 GW | 52.4 GW | 70% | 4.6 GW | 76 GW |
| CAISO | 34.8 GW | 48.6 GW | 72% | 1.4 GW | 101 GW |
| NW | 28.4 GW | 46.2 GW | 61% | 3.8 GW | 68 GW |
| NYISO | 17.6 GW | 32.1 GW | 55% | 1.0 GW | 42 GW |
| ISO-NE | 12.4 GW | 24.8 GW | 50% | 0.4 GW | 34 GW |
Load / gen is this hour’s demand divided by net generation (GRIDFRONT modeled). Not a reserve margin and not load / installed.
How regions are defined
Each EIA-930 respondent is in exactly one row. ISO/RTO BAs where they exist; EIA regions otherwise. No NERC SERC/FRCC roll-up.
- PJM ← PJM
- MISO ← MISO (includes MISO South / Entergy)
- ERCOT ← ERCO
- SPP ← SWPP
- CAISO ← CISO
- NYISO ← NYIS
- ISO-NE ← ISNE
- Southeast ← SE + TEN + CAR (not MISO, not FLA)
- Florida ← FLA only
- Northwest ← NW
- Southwest ← SW
Map color uses primary-state membership as a convenience: Illinois ComEd is PJM; the rest of Illinois paints as MISO. Indiana is split. Texas panhandle is SPP. That coloring is not a BA boundary file.